Systems, by building zone.
Water attacks different parts of a building in different ways, so each zone gets its own build-up. These are the systems we install most, drawn as we install them, layer by layer from the structure up. Products are Chemind-group systems unless the specification calls for something else.
Every build-up below is a typical detail. On site we adapt it to the substrate, the falls and the finish, and we say so in the method statement.
- RC roofs
- Roof gardens & planters
- Basements & retaining walls
- Water tanks
- Wet areas & kitchens
- Swimming pools
- Expansion joints
- Industrial & car park floors
- Metal deck roofs
- Re-waterproofing

RC flat roofs.
Exposed roofs, plant decks and roof terraces on reinforced concrete slabs. The system carries foot traffic, plant and sun for the life of the building.
Ask us about a roofBuild-up, from the slab up
- Base screed to fallsCement and sand (1:4), 25 mm average, laid to drain.
- Primer W, then three coats of Chemflex R100Heavy-duty reinforced synthetic rubber membrane, fully bonded.
- Hydrofoam HD insulation, 50 mmExtruded polystyrene board over the membrane.
- Separation sheet500-gauge polyethylene between insulation and the protective screed.
- Protection concrete, 75 mm minimumGrade 25 with BRC A5 mesh, cut into 2 m panels, every joint sealed with Polyseal 1PUA polyurethane sealant.
- Duracote HB, two coatsPolyurethane coating where the roof stays exposed.

Roof gardens and planters.
Landscape decks, podium gardens and planter boxes. Roots, standing water and soil load make this the hardest roof to keep dry, so the membrane is protected twice and drained properly.
Ask us about a landscape deckBuild-up, from the slab up
- Monolithic Membrane 6125Hot-applied rubberised asphalt, seamless, reinforced with Flex Flash F fabric. On smaller planters we use Primer W with three coats of Chemflex R100 instead.
- Protective screed, 25 mmCement and sand (1:4), fibre-reinforced.
- ProtectoboardRoot protection over the membrane.
- Hydrodrain drainage cellKeeps water moving to the outlets instead of sitting on the membrane.
- GS 5010 geotextileNon-clogging filter so the soil stays out of the drainage layer.
- Soil and plantingBy the landscape contractor, once we have tested the deck.

Basements and retaining walls.
Below-ground slabs, lift pits and walls against earth. Water here is under pressure and there is no second chance once the backfill is in, so the structure itself is made watertight and the membrane goes on the outside.
Ask us about a basementBuild-up, from the outside in
- Sealostick sheet membrane on lean concreteSelf-adhesive polymer-modified bituminous sheet, HDPE-faced, under the slab and behind the wall.
- Concrete dosed with Mixkote MIMCrystallisation admixture, so the concrete itself resists water.
- Centreseal 250 PVC waterstopAt every construction joint.
- Structural crack repair with Chemfoam PU6261Injected where the water test finds a path.
- Polystyrene protection boardSo the backfill never touches the membrane.

RC water tanks.
Suction tanks, elevated tanks and reservoirs. The water is on the inside and it is drinking water, so the coating has to hold under a permanent head and stay inert.
Ask us about a tankBuild-up, from the structure in
- Structural water test, then Mixkote MIM in the concreteThe tank is filled and checked before anything is applied; the concrete is dosed with crystallisation admixture.
- Centreseal 250 PVC waterstopAt construction joints.
- Ponding test and making goodDefects in the structure are repaired by the main contractor before we start.
- Crack repair with Chemfoam PU6261Injected structural repair where needed.
- Protective screed, 25 mmCement and sand (1:4).
- Brushcrete FX, two coatsFlexible two-component polymer-modified cementitious membrane.

Wet areas and kitchens.
Toilets, bathrooms, yards, balconies and commercial kitchens. Small areas, many penetrations, and the leak shows up in someone else's ceiling. The angle fillet and the upstand are where the job is won.
Ask us about wet areasBuild-up, from the slab up
- Brushcrete FX, two coatsFlexible two-component polymer-modified cementitious membrane, taken up every wall and around every pipe.
- Cement and sand screedTo falls, to the floor trap.
- Flextile 555 tile adhesiveFlexible, so tiling movement does not crack the membrane.
- Tiles or other finishesBy others, after our ponding test.
- Commercial kitchens with heavy washing and hot fat take an epoxy build-up instead: Epiprime primer, Epilox 246 EM epoxy mortar screed, Epilox 246 SL epoxy coating, finished with Epithane CPS polyurethane.

Swimming pools and water features.
Pools, lazy rivers, fountains and reflecting ponds. A permanent head of water on a structure that moves with temperature: the membrane has to bridge cracks and the tiling has to stay bonded.
Ask us about a poolBuild-up, from the shell up
- Structural water test and making goodBy the main contractor, before we start.
- Crack repair with Chemfoam PU6261Injected where the test finds a path.
- Brushcrete FX, two coatsFlexible two-component polymer-modified cementitious membrane.
- Cement and sand screedRendered and screeded to line.
- Flextile 555 tile adhesiveFlexible, for pool tiles and mosaics.
- Tiles and finishesBy the pool contractor.

Expansion and construction joints.
Car park decks, podiums, bridges and long buildings. The joint is designed to move; the treatment has to move with it for thirty years and still keep the water out.
Ask us about jointsBuild-up, as numbered on the drawing
- Prepared concreteHydro-scarified so the grout keys in.
- Chemgrout 215Non-shrink grout with aggregate, reinstating the joint edges.
- Primer WAcrylic primer.
- Decktop 3000SAnti-carbonation coating on the exposed concrete.
- Flexjoint EPBonded expansion joint waterproofing membrane across the gap.
- Mechanical joint coverAluminium or stainless cover system, sized to the movement.

Industrial and car park floors.
Factory floors, loading bays, car parks and plant rooms. Forklifts, chemicals and hot wash-downs, on a floor that has to stay seamless and cleanable.
Ask us about flooringBuild-up, from the slab up
- Substrate preparationShot-blasted or ground, moisture checked.
- EpiprimeEpoxy primer.
- Epithane CPSMedium-duty polyurethane self-levelling screed. Heavier duty takes Epilox 246 epoxy mortar underneath; car parks take a floor hardener or a PU deck coating instead.

Metal deck roofs.
Factory and warehouse roofs that leak at the laps and the fixings. Sprayed on, seamless, and the roof stays in service while we work.
Ask us about a metal roofBuild-up, from the sheet up
- Existing corrugated sheetCleaned, fixings tightened, rust treated.
- Epiprime with quartz sand broadcastEpoxy primer, keyed for the membrane.
- Polyseal Polyurea-HTwo-component hybrid polyurea membrane, spray-applied.
- UV-resistant top coatProtects the membrane from the sun.

Re-waterproofing.
Roofs that have failed, on buildings that cannot stop. Most of our repair work is this: overlaying a live roof without stripping it, in sections, between the rain.
Ask us about a leaking roofBuild-up, as numbered on the drawing
- Existing waterproofingSurveyed, blisters cut out, surface conditioned.
- Monolithic Membrane 6125, 3 mmHot-applied rubberised asphalt, seamless over the old system.
- Sealopol protection sheetMineral-surfaced bituminous membrane, torch-sealed at the edges.
- Duracote HB, two coatsPolyurethane coating where the roof stays exposed.