Kept dry since 1987.
Waterproofing, joints and flooring for the contractors who build Malaysia's landmarks. Applied by our own crews.
0 years on site. CIDB G7, no tender limit. 0 people, all ours.
Hydrocon Enterprise Sdn Bhd, incorporated 15 June 1987. Registered Grade G7 in building, civil engineering and mechanical works, including B08 waterproofing. Thirty-two staff and seventy-six site workers on our own payroll, so the crew that quotes is the crew that turns up.
Water only needs one gap.
A joint left open. A corner not turned. A detail nobody drew. The building shows it two monsoons later, in the ceiling of the floor below, and by then the repair costs more than the roof did.
So we treat every edge, upstand and penetration as the job, because that is where the job is won or lost.
The system, layer by layer.
Clients ask what actually goes on the slab. This is a hot-applied roof system as we install it, in the order we install it.
- Reinforced concrete slabCleaned, dried and checked for falls.
- Surface conditionerBituminous primer, so the membrane grips the concrete.
- MONOLITHIC MEMBRANE 6130K, first coatHot-applied monolithic membrane, two millimetres minimum.
- FLEX FLASH F fabricReinforcement, broomed in while the coat is still warm.
- MONOLITHIC MEMBRANE 6130K, second coatSeals the fabric into one seamless layer. No laps to fail.
- SEALOPOL 3PProtection membrane, torch-sealed at every edge and upstand.
- Protection screedConcrete topping with scored joints, so cracks go where we want them.
- Then we flood it.Ponding test before handover. It stays on top.
Central Market, Kuala Lumpur.
A heritage roof, re-waterproofed by our own crews: hot-applied MONOLITHIC MEMBRANE 6130K, poured and torched into one seamless skin.
The landscape deck and the expansion joints on the same building, by the same crews. The building stayed open.
0 years of them, and counting.
See how the system goes downRoofs you already know
Merdeka 118. All three towers at 8 Conlay. KL Sentral: the station, Shell Tower, Le Meridien and Hilton. KLIA 2.
Repairs at the Prime Minister's Office. The Convention Centre in Putrajaya. MITI. Matrade. Menara TM. Berjaya Times Square.
39 years of them, and counting. See all 312 project references
Tell us what must stay dry.
Send us the drawings, or just the problem. We will come to site, look at the detail and price what it actually needs.
